Produkt information
Længde: 45
Bredde: 27
Højde: 19
Vægt: 2.88 kg
Leverandørbeskrivelse (EN)
Oil Sump, Steel
IVECO DAILY II BOX BODY / ESTATE (05.99-10.09) | |||||||
---|---|---|---|---|---|---|---|
Duty | Production year | KW | HP | Engine code | From year | To year | |
29 L 10 V | 09.02-07.07 | 70 | 95 | F1AE0481A |
|
||
29 L 12 V | 09.02-07.07 | 85 | 116 | F1AE0481B |
|
||
29 L 14 | 01.05-04.06 | 100 | 136 | F1AE0481M |
|
||
35 C 12 V, 35 S 12 V | 09.02-07.07 | 85 | 116 | F1AE0481B |
|
||
35 C 14, 35 S 14 | 01.05-04.06 | 100 | 136 | F1AE0481M |
|
||
35 S 10 | 09.02-07.07 | 70 | 95 | F1AE0481A |
|
||
IVECO DAILY II FLATBED / CHASSIS (03.98-10.09) | |||||||
Duty | Production year | KW | HP | Engine code | From year | To year | |
29 L 10 | 09.02-04.06 | 70 | 95 | F1AE0481A |
|
||
29 L 12 | 09.02-04.06 | 85 | 116 | F1AE0481B |
|
||
29 L 14 | 11.05-04.06 | 100 | 136 | F1AE0481M |
|
||
35 C 10 V , 35 S 10 V | 09.02-04.06 | 70 | 95 | F1AE0481A |
|
||
35 C 12 , 35 S 12 | 09.02-04.06 | 85 | 116 | F1AE0481B |
|
||
35 C 14, 35 S 14 | 01.05-04.06 | 100 | 136 | F1AE0481M |
|
||
40 C 10 (AEJB14A1) | 09.02-04.06 | 70 | 95 | F1AE0481A |
|
||
IVECO DAILY III BOX BODY / ESTATE (05.06-03.12) | |||||||
Duty | Production year | KW | HP | Engine code | From year | To year | |
29L10 V | 05.06-08.11 | 70 | 95 | F1AE0481F |
|
||
29L12 V, 29L12 V/P | 05.06-08.11 | 85 | 116 | F1AE0481G |
|
||
29L14 C, 29L14 C/P, 29L14 V, 29L14 V/P | 05.06-08.11 | 100 | 136 | F1AE0481H |
|
||
35C10, 35S10 | 05.06-08.11 | 70 | 95 | F1AE0481F |
|
||
35C11 V, 35S11 V | 07.07-08.11 | 78 | 106 | F1AE0481U |
|
||
35C12 V, 35C12 V/P, 35S12 V, 35S12 V/P | 05.06-08.11 | 85 | 116 | F1AE0481G, F1AE0481R |
|
||
35C13 V, 35C13 V/P, 35S13 V, 35S13 V/P | 07.07-08.11 | 93 | 126 | F1AE0481V |
|
||
35S14 C, 35S14 C/P, 35S14 V, 35S14 V/P, 35C14 V, 3 | 05.06-08.11 | 100 | 136 | F1AE0481H |
|
||
40C10 V | 05.06-08.11 | 70 | 95 | F1AE0481F |
|
||
40C11 V | 07.07-08.11 | 78 | 106 | F1AE0481U |
|
||
40C12 V, 40C14 V/P | 05.06-08.11 | 85 | 116 | F1AE0481G |
|
||
40C13 V, 40C13 V/P | 07.07-08.11 | 93 | 126 | F1AE0481V |
|
||
IVECO DAILY III BUS (05.99-05.06) | |||||||
Duty | Production year | KW | HP | Engine code | From year | To year | |
35 S 12 | 01.03-05.06 | 85 | 116 | F1AE0481B |
|
||
IVECO DAILY III FLATBED / CHASSIS (05.06-03.12) | |||||||
Duty | Production year | KW | HP | Engine code | From year | To year | |
29L10 | 05.06-08.11 | 70 | 95 | F1AE0481F |
|
||
29L12 | 05.06-08.11 | 85 | 116 | F1AE0481G |
|
||
29L14 | 05.06-08.11 | 100 | 136 | F1AE0481H |
|
||
35C10, 35S10 | 05.06-08.11 | 70 | 95 | F1AE0481F |
|
||
35C11, 35S11, 35S11 D | 07.07-08.11 | 78 | 106 | F1AE0481U |
|
||
35C12, 35S12 | 05.06-08.11 | 85 | 116 | F1AE0481G, F1AE0481R |
|
||
35C13, 35C13 /P, 35S13 D, 35S13, 35S13 /P | 07.07-08.11 | 93 | 126 | F1AE0481V |
|
||
35S14 | 05.06-08.11 | 100 | 136 | F1AE0481H |
|
||
40C10, 40S10 | 05.06-08.11 | 70 | 95 | F1AE0481F |
|
||
40C11, 40C11 D, 40S11, 40S11 D | 07.07-08.11 | 78 | 106 | F1AE0481U |
|
||
40C12 | 05.06-08.11 | 85 | 116 | F1AE0481G |
|
||
40C13, 40C13 /P, 40S13 D, 40S13, 40S13 /P | 07.07-08.11 | 93 | 126 | F1AE0481V |
|
||
IVECO DAILY V BOX BODY / ESTATE (09.11-02.14) | |||||||
Duty | Production year | KW | HP | Engine code | From year | To year | |
29L11 V, 35C11 V, 35S11 V, 40C11 V | 09.11-02.14 | 78 | 106 | F1AE3481A |
|
||
29L13 V, 35C13 V, 35S13 V, 40C13 V, 40S13 V | 09.11-02.14 | 93 | 126 | F1AE3481B |
|
||
29L15 V, 35C15L V, 40C15L V, 50C15L V | 09.11-02.14 | 107 | 146 | F1AE3481C |
|
||
IVECO DAILY V PLATFORM/CHASSIS (09.11-02.14) | |||||||
Duty | Production year | KW | HP | Engine code | From year | To year | |
26L11, 26L11D, 35C11D, 35S11, 40C11 | 09.11-02.14 | 78 | 106 | F1AE3481A |
|
||
29L13, 29L13D, 35C13D, 40C13 | 09.11-02.14 | 93 | 126 | F1AE3481B |
|
||
29L15 V, 35C15L V, 40C15L V, 50C15L V | 09.11-02.14 | 107 | 146 | F1AE3481C |
|
Levering af varer
Prekes, esančias mūsų sandėlyje, Lietuvos teritorijoje, kurjeris Jums pristatys per 1- 3 darbo dienas. Jei prekių sandėlyje nėra, užsakymo sukomplektavimas ir pristatymo terminas gali trukti nuo 2 iki 30 d.d. Jei užsakymo paruošimas truks ilgiau nei 5 d.d., el. paštu gausite pranešimą apie numatomą užsakymo paruošimo datą.