Frame Side Rail, both sides

SKU K2562800

48,00 €
Offer your price

Product information

FRAME SIDE RAIL, LEFT AND RIGHT

Length: 54
Width: 10
Height: 4
Weight: 0.7 kg

Supplier description (EN)

Frame Side Rail, both sides


FORD FIESTA BOX (F3L, F5L) (04.89-02.96)
Duty Production year KW HP Engine code From year To year
1.30 09.91-02.96 44 60 J6B
1.80 D 09.91-02.96 44 60 RTC, RTD, RTG
FORD FIESTA BOX (FVD) (03.83-12.95)
Duty Production year KW HP Engine code From year To year
1.00 08.83-11.89 33 45 TKB
1.40 09.86-09.89 52 71 F6A
1.80 D (FVJ) 03.89-12.95 44 60 RTC, RTD, RTG
FORD FIESTA BOX (WFVT) (05.76-11.86)
Duty Production year KW HP Engine code From year To year
1.00 (WFVT) 10.77-11.86 29 40 TKA
1.10 (WFVT) 10.77-11.86 39 53 GL1, GLA
FORD FIESTA I (GFBT) (05.76-08.83)
Duty Production year KW HP Engine code From year To year
0.90 05.76-08.83 29 40 TKA, TKW
0.90 05.76-08.83 33 45 TLA
1.10 05.76-08.83 39 53 GLA
1.10 (WFBT) 02.81-08.83 40 55 GLW
1.30 08.77-08.83 49 66 J3E
1.60 XR2 08.81-08.83 62 84 L3E
1.60 XR2 09.81-08.83 71 97 L3E
FORD FIESTA II (FBD) (09.83-11.89)
Duty Production year KW HP Engine code From year To year
1.00 (FBD) 09.83-02.89 33 45 TKB
1.10 (FBD) 05.86-02.89 36 49 GSH
1.10 (FBD) 09.83-02.89 37 50 GLC, GSF
1.30 09.83-09.89 51 69 JPC
1.30 (FBD) 09.83-01.87 51 69 JPC
1.40 09.83-01.87 51 69 FUBA
1.40 (FBD) 02.87-02.89 54 73 FUD
1.40 (FBD) 10.85-11.89 55 75 FUB
1.40 (FBD) 10.86-02.89 52 71 F6A, F6C
1.60 01.85-11.89 58 79 LP3
1.60 D (FBD) 04.84-02.89 40 54 LTB
1.60 XR2 (FBD) 03.84-02.89 70 95 LUD
1.60 XR2 (FBD) 04.84-02.89 71 97 LUB
FORD FIESTA III (GFJ) (01.89-01.97)
Duty Production year KW HP Engine code From year To year
1.00 03.89-12.95 33 45 TLB
1.10 03.89-12.95 37 50 G6A
1.10 03.89-12.95 40 55 GUD, GUE
1.30 03.89-12.92 44 60 JBC
1.30 03.89-12.95 44 60 JBB, JBC
1.30 KAT 05.91-01.97 44 60 J6B
1.40 03.89-12.95 52 71 F6E
1.40 03.89-12.95 54 73 FUG, FUJ, F4A
1.40 11.92-12.96 55 75 FUF
1.60 01.89-01.94 65 88 LUH
1.60 03.89-12.92 66 90 LUH
1.60 i 16V 01.94-12.95 65 88 L1G
1.60 Turbo (FBJT) 03.90-10.92 96 131 LHA
1.60 XR2i 03.89-01.94 81 110 LJC
1.60 XR2i 03.89-03.93 76 103 LJD
1.80 16V 02.92-12.95 77 105 RDB
1.80 D 03.89-12.95 44 60 RTC, RTD, RTG
1.80 TD 03.93-12.95 55 75 RFL
1.80 XR2i 16V 02.92-12.95 96 130 RQC

Delivery of goods

Prekes, esančias mūsų sandėlyje, Lietuvos teritorijoje, kurjeris Jums pristatys per 1- 3 darbo dienas. Jei prekių sandėlyje nėra, užsakymo sukomplektavimas ir pristatymo terminas gali trukti nuo 2 iki 30 d.d. Jei užsakymo paruošimas truks ilgiau nei 5 d.d., el. paštu gausite pranešimą apie numatomą užsakymo paruošimo datą.