Headlight, Right, Xenon, Indicator Colour: yellow, with motor for headlamp levelling, without control unit for Xenon, D1S (gas discharge tube), AL

SKU K40010192A1

Product information

HEADLIGHT, RIGHT, XENON

Length: 55
Width: 38
Height: 32
Weight: 3.2 kg

Supplier description (EN)

Headlight, Right, Xenon, Indicator Colour: yellow, with motor for headlamp levelling, without control unit for Xenon, D1S (gas discharge tube), AL


MINI MINI (R56) (11.05-01.14)
Duty Production year KW HP Engine code From year To year
Cooper 09.06-11.13 85 115 N12 B16 A, N16 B16 A
Cooper 09.09-11.13 90 122 N12 B16 A, N16 B16 A
Cooper 10.06-02.12 88 120 N12 B16 A, N16 B16 A
Cooper D 02.11-11.13 82 112 N47 C20 A
Cooper D 06.10-11.13 82 112 N47 C16 A
Cooper D 11.06-09.10 80 109 9HZ (DV6TED4), W16 D16 (9HZ)
Cooper S 01.12-11.13 147 200 N18 B16 A
Cooper S 03.10-11.13 120 163 N18 B16 A
Cooper S 03.10-11.13 135 184 N18 B16 A
Cooper S 10.06-02.10 128 174 N14 B16 A, N14 B16 AB
Cooper SD 02.11-11.13 100 136 N47 C20 A
Cooper SD 02.11-11.13 105 143 N47 C20 A
John Cooper Works 11.06-02.10 141 192 N14 B16 A, N14 B16 AB
John Cooper Works 11.07-11.13 155 211 N18 B16 C, N14 B16 C
John Cooper Works GP 09.12-11.13 160 218 N18 B16 C, N14 B16 C
One 03.09-03.10 55 75 N12 B14 A
One 03.10-11.13 55 75 N16 B16 A
One 03.10-11.13 72 98 N16 B16 A
One 11.06-03.10 70 95 N12 B14 A
One D 06.09-07.10 66 90 9HZ (DV6TED4)
One D 07.10-11.13 66 90 N47 C16 A
One LPG 03.09-03.10 55 75 N12 B14 A
MINI MINI CLUBMAN (R55) (10.06-12.15)
Duty Production year KW HP Engine code From year To year
1.60 08.07-07.10 128 174 N14 B16 A, N14 B16 AB
1.60 10.07-06.14 120 163 N18 B16 A, N14 B16 AB
1.60 10.07-12.13 88 120 N12 B16 A, N16 B16 A
1.60 D 10.07-02.10 80 109 9HZ (DV6TED4)
Cooper 03.10-06.14 85 115 N16 B16 A
Cooper 03.10-06.14 90 122 N16 B16 A
Cooper D 02.11-06.14 82 112 N47 C20 A
Cooper D 03.10-06.14 82 112 N47 C16 A
Cooper S 03.10-06.14 135 184 N18 B16 A
Cooper S 03.10-06.14 147 200 N18 B16 A
Cooper SD 02.11-06.14 100 136 N47 C20 A
Cooper SD 02.11-06.14 105 143 N47 C20 A
John Cooper Works 10.08-02.10 141 192 N14 B16 AB
John Cooper Works 11.07-06.14 155 211 N18 B16 C, N14 B16 C
One 03.09-02.10 70 95 N12 B14 A
One 03.10-06.14 72 98 N16 B16 A
One D 03.10-06.14 66 90 N47 C16 A
MINI MINI CONVERTIBLE (R57) (10.07-06.15)
Duty Production year KW HP Engine code From year To year
Cooper 03.10-06.15 90 122 N16 B16 A
Cooper 12.08-06.15 85 116 N12 B16 A, N16 B16 A
Cooper 12.08-07.10 88 120 N12 B16 A
Cooper D 02.11-05.15 82 112 N47 C20 A
Cooper D 05.09-11.13 82 112 N47 C16 A
Cooper S 02.10-06.15 135 184 N18 B16 A
Cooper S 02.10-06.15 147 200 N18 B16 A
Cooper S 04.08-07.10 141 192 N14 B16 A, N14 B16 AB
Cooper S 10.07-06.15 120 163 N14 B16 A, N18 B16 A
Cooper S 12.08-07.10 128 174 N14 B16 A, N14 B16 AB
Cooper SD 01.11-05.15 100 136 N47 C20 A
Cooper SD 06.09-05.15 105 143 N47 C20 A
John Cooper Works 08.08-05.15 155 211 N18 B16 C, N14 B16 C
One 09.09-06.15 72 98 N16 B16 A
MINI MINI COUPE (R58) (12.10-05.15)
Duty Production year KW HP Engine code From year To year
Cooper 12.10-04.15 85 115 N16 B16 A
Cooper 12.10-04.15 90 122 N16 B16 A
Cooper S 12.10-04.15 120 163 N18 B16 A
Cooper S 12.10-04.15 135 184 N14 B16 A, N18 B16 A
Cooper S 12.10-04.15 147 200 N18 B16 A
Cooper SD 12.10-05.15 100 136 N47 C20 A
Cooper SD 12.10-05.15 105 143 N47 C20 A
John Cooper Works 12.10-05.15 155 211 N18 B16 C, N14 B16 C
MINI MINI ROADSTER (R59) (01.11-04.15)
Duty Production year KW HP Engine code From year To year
Cooper 11.11-04.15 85 115 N16 B16 A
Cooper 11.11-04.15 90 122 N16 B16 A
Cooper S 11.11-04.15 120 163 N18 B16 A
Cooper S 11.11-04.15 135 184 N18 B16 A
Cooper S 11.11-04.15 147 200 N18 B16 A
Cooper SD 11.11-04.15 100 136 N47 C20 A
Cooper SD 11.11-04.15 105 143 N47 C20 A
John Cooper Works 11.11-04.15 155 211 N18 B16 C, N14 B16 C

Delivery of goods

Prekes, esančias mūsų sandėlyje, Lietuvos teritorijoje, kurjeris Jums pristatys per 1- 3 darbo dienas. Jei prekių sandėlyje nėra, užsakymo sukomplektavimas ir pristatymo terminas gali trukti nuo 2 iki 30 d.d. Jei užsakymo paruošimas truks ilgiau nei 5 d.d., el. paštu gausite pranešimą apie numatomą užsakymo paruošimo datą.