Headlight, TYC, H7/H1, with motor for headlamp levelling, Right, Illuminance [lx]: 12.5

SKU K55190142

212,00 €
Gi din pris

Produktinformasjon

Lengde: 85
Bredde: 33
Høyde: 28
Vekt: 3.7 kg

Leverandørbeskrivelse (EN)

Headlight, TYC, H7/H1, with motor for headlamp levelling, Right, Illuminance [lx]: 12.5


PEUGEOT 308 (4A_, 4C_) (09.07-12.16)
Duty Production year KW HP Engine code From year To year
1.40 16V 09.07-10.14 70 95 8FS (EP3), EP3 03.2011
1.40 16V 12.09-10.14 72 98 8FR (EP3) 03.2011
1.60 16V 03.08-10.14 128 174 5FY (EP6DTS) 03.2011
1.60 16V 09.07-10.14 103 140 5FT (EP6DT) 03.2011
1.60 16V 09.07-10.14 110 150 5FX (EP6DT) 03.2011
1.60 16V 09.07-10.14 88 120 5FS (EP6C), 5FW (EP6), 5FS (EP6C M) 03.2011
1.60 16V 10.09-10.14 115 156 5FV (EP6CDT) 03.2011
1.60 BioFlex 04.08-10.14 80 109 NFU (TU5JP4) 03.2011
1.60 GTi 07.10-10.14 147 200 5FY (EP6CDTX) 03.2011
1.60 HDi 09.07-10.14 66 90 9HX (DV6ATED4), 9HV (DV6TED4B), 9HV (DV6TED4BU) 03.2011
1.60 HDi 09.07-10.14 80 109 9HZ (DV6TED4), 9HY (DV6TED4) 03.2011
1.60 HDi 11.09-10.14 68 92 9HP (DV6DTED), 9HJ (DV6DTEDM) 03.2011
1.60 HDi 12.09-10.14 82 112 9HR (DV6C) 03.2011
2.00 HDi 07.10-12.12 103 140 RHR (DW10BTED4) 03.2011
2.00 HDi 09.07-10.14 100 136 RHR (DW10BTED4), RHR (DW10CB) 03.2011
PEUGEOT 308 CC (02.09-12.15)
Duty Production year KW HP Engine code From year To year
1.60 16V 06.09-12.14 103 140 5FT (EP6DT) 03.2011
1.60 16V 06.09-12.14 110 150 5FX (EP6DT) 03.2011
1.60 16V 06.09-12.14 115 156 5FV (EP6CDT) 03.2011
1.60 16V 06.09-12.14 88 120 EP6 03.2011
1.60 HDi 06.09-12.14 82 112 9HR (DV6C) 03.2011
1.60 THP 10.10-12.14 147 200 5FY (EP6CDTX) 03.2011
2.00 D 04.09-12.12 103 140 RHF (DW10BTED4) 03.2011
2.00 HDi 04.09-12.14 100 136 RHR (DW10BTED4), RHR (DW10CB) 03.2011
2.00 HDi 06.09-12.14 120 163 RHH (DW10CTED4) 03.2011
PEUGEOT 308 SW (09.07-10.14)
Duty Production year KW HP Engine code From year To year
1.40 16V 09.07-10.14 70 95 8FS (EP3) 03.2011
1.40 16V 12.09-10.14 72 98 8FR (EP3C) 03.2011
1.60 16V 03.08-10.14 128 174 5FY (EP6DTS) 03.2011
1.60 16V 09.07-10.14 103 140 5FT (EP6DT) 03.2011
1.60 16V 09.07-10.14 110 150 5FX (EP6DT) 03.2011
1.60 16V 09.07-10.14 88 120 5FS (EP6C), 5FW (EP6) 03.2011
1.60 16V 10.09-10.14 115 156 5FV (EP6CDT) 03.2011
1.60 Bioflex 03.09-10.14 82 112 NFU (TU5JP4) 03.2011
1.60 HDi 09.07-10.14 66 90 9HX (DV6ATED4), 9HV (DV6TED4BU) 03.2011
1.60 HDi 09.07-10.14 80 109 9HZ (DV6TED4), 9HY (DV6TED4) 03.2011
1.60 HDi 11.09-10.14 68 92 9HP (DV6DTED) 03.2011
1.60 HDi 12.09-10.14 82 112 9HR (DV6C) 03.2011
2.00 Bioflex 01.08-12.11 103 140 RFJ (EW10A) 03.2011
2.00 HDi 06.09-10.14 120 163 RHH (DW10CTED4) 03.2011
2.00 HDi 09.07-10.14 103 140 RHR (DW10BTED4) 03.2011
2.00 HDi 09.07-12.12 100 136 RHR (DW10BTED4) 03.2011

Varelevering

Prekes, esančias mūsų sandėlyje, Lietuvos teritorijoje, kurjeris Jums pristatys per 1- 3 darbo dienas. Jei prekių sandėlyje nėra, užsakymo sukomplektavimas ir pristatymo terminas gali trukti nuo 2 iki 30 d.d. Jei užsakymo paruošimas truks ilgiau nei 5 d.d., el. paštu gausite pranešimą apie numatomą užsakymo paruošimo datą.