Actuator, headlight levelling, for vehicles without xenon light, Electric

SKU K90210060

87,00 €
Gi din pris

Produktinformasjon

Lengde: 9
Bredde: 7
Høyde: 7
Vekt: 0.16 kg

Leverandørbeskrivelse (EN)

Actuator, headlight levelling, for vehicles without xenon light, Electric


VOLVO S60 (07.00-04.10)
Duty Production year KW HP Engine code From year To year
2.00 T 07.00-04.10 132 180 B 5204 T5 05.2004
2.30 T5 07.00-09.02 195 265 B 5234 T7
2.40 07.00-04.10 103 140 B 5244 S2 05.2004
2.40 11.00-04.10 125 170 B 5244 S 05.2004
2.40 Bifuel 07.01-04.10 103 140 B 5244 SG2, B 5244 SG 05.2004
2.40 Bifuel (LPG) 07.01-04.10 103 140 B 5244 SG2 05.2004
2.40 CDI 10.03-12.05 85 116 D 5244 T3 05.2004
2.40 D 05.01-04.10 96 130 D 5244 T2 05.2004
2.40 D5 01.01-04.10 120 163 D 5244 T, D 5244 T5 05.2004
2.40 T 07.00-04.10 147 200 B 5244 T3 05.2004
2.40 T AWD 06.01-04.10 147 200 B 5244 T3 05.2004
2.40 T5 04.04-04.10 191 260 B 5244 T5 05.2004
2.50 T 01.03-04.10 154 210 B 5254 T2 05.2004
2.50 T AWD 07.02-04.10 154 210 B 5254 T2 05.2004
R 2,5 T AWD 01.03-04.10 221 300 B 5254 T4 05.2004
T5 07.00-04.10 184 250 B 5234 T3 05.2004
VOLVO S80 (TS, XY) (05.98-02.08)
Duty Production year KW HP Engine code From year To year
2.00 06.98-07.06 120 163 B 5204 T4
2.00 T 06.98-07.06 166 226 B 5204 T3
2.00 T 12.99-07.06 132 180 B 5204 T5
2.30 R 04.00-08.05 195 265 B 5234 T7
2.40 01.99-07.06 103 140 B 5244 S2
2.40 01.99-07.06 125 170 B 5244 S
2.40 Bifuel 09.01-07.06 103 140 B 5244 SG2
2.40 Bifuel (LPG) 09.01-07.06 103 140 B 5244 SG
2.40 D 10.01-07.06 96 131 D 5244 T2
2.40 D5 08.01-07.06 120 163 D 5244 T
2.40 T 06.00-07.06 147 200 B 5244 T3
2.40 T5 AWD 04.00-09.03 147 200 B 5244 T3
2.50 T 03.03-07.06 154 210 B 5254 T2
2.50 T AWD 07.03-07.06 154 210 B 5254 T2
2.50 TDI 01.99-07.06 103 140 D 5252 T
2.80 T6 05.98-12.01 200 272 B 6284 T
2.90 03.99-07.06 147 200 B 6294 S
2.90 05.98-02.08 144 196 B 6294 S2
2.90 05.98-07.06 150 204 B 6304 S3
3.00 06.01-07.06 144 196 B 6294 S2
3.00 T6 06.01-07.06 200 272 B 6294 T
VOLVO V70 II ESTATE (P80_) (11.99-12.08)
Duty Production year KW HP Engine code From year To year
2.00 T 11.99-08.07 132 180 B 5204 T5 05.2004
2.30 10.00-09.04 195 265 B 5234 T7 05.2004
2.30 T5 11.99-12.04 184 250 B 5234 T3 05.2004
2.40 03.00-08.07 103 140 B 5244 S2 05.2004
2.40 03.00-08.07 125 170 B 5244 S 05.2004
2.40 Bifuel 09.01-08.07 103 140 B 5244 SG2, B 5244 SG 05.2004
2.40 Bifuel (LPG) 09.01-08.07 103 140 B 5244 SG2 05.2004
2.40 D 07.01-08.07 96 131 D 5244 T2 05.2004
2.40 D5 01.01-12.08 120 163 D 5244 T2, D 5244 T, D 5244 T5 05.2004
2.40 D5 AWD 07.02-08.07 120 163 D 5244 T2, D 5244 T, D 5244 T5 05.2004
2.40 T 11.99-08.03 147 200 B 5244 T3
2.40 T AWD 09.01-08.02 147 200 B 5244 T3
2.40 T5 04.04-08.07 191 260 B 5244 T5 05.2004
2.50 AWD 09.02-12.04 155 211 B 5254 T2 05.2004
2.50 T 07.01-08.07 154 209 B 5254 T2 05.2004
2.50 T AWD 07.02-08.07 154 209 B 5254 T2 05.2004
2.50 TDI 11.99-08.07 103 140 D 5252 T 05.2004
R 2,5 T AWD 03.03-08.07 221 300 B 5254 T4 05.2004
VOLVO XC 90 (06.02-01.15)
Duty Production year KW HP Engine code From year To year
2.50 01.03-12.06 153 208 B 5254 T2
2.50 AWD 06.02-12.14 153 208 B 5254 T2
2.50 T 10.02-09.14 154 209 B 5254 T2
2.50 T 10.12-09.14 154 209 B 5254 T9
3.20 03.06-12.10 175 238 B 6324 S
3.20 04.10-09.14 179 243 B 6324 S5
3.20 09.11-09.14 175 238 B 6324 S
3.20 09.11-09.14 179 243 B 6324 S5
D5 01.11-12.14 147 200 D 5244 T18
D5 04.05-12.12 136 185 D 5244 T4
D5 04.09-12.14 120 163 D 5244 T5
D5 10.02-12.06 120 163 D 5244 T
D5 AWD 10.07-12.10 120 163 D 5244 T5
D5 AWD 11.13-09.14 155 211 D 5244 T18
T6 10.02-12.06 200 272 B 6294 T
V8 01.05-12.10 232 316 B 8444 S
V8 AWD 09.04-12.05 235 320 B 8444 S
VOLVO XC70 CROSS COUNTRY (10.97-10.07)
Duty Production year KW HP Engine code From year To year
2.40 D5 XC AWD 09.02-08.07 120 163 D 5244 T 05.2004
2.40 T XC AWD 03.00-09.02 147 200 B 5244 T3
2.40 T XC AWD 11.97-09.02 142 193 B 5254 T 03.2000
2.50 T XC AWD 09.02-08.07 154 209 B 5254 T2 05.2004

Varelevering

Prekes, esančias mūsų sandėlyje, Lietuvos teritorijoje, kurjeris Jums pristatys per 1- 3 darbo dienas. Jei prekių sandėlyje nėra, užsakymo sukomplektavimas ir pristatymo terminas gali trukti nuo 2 iki 30 d.d. Jei užsakymo paruošimas truks ilgiau nei 5 d.d., el. paštu gausite pranešimą apie numatomą užsakymo paruošimo datą.