Headlight, Right, H7/H7, with daytime running light (LED), with motor for headlamp levelling

SKU K00860144

Informacje o produkcie

Długość: 67
Szerokość: 34
Wysokość: 31
Waga: 4.2 kg

Opis dostawcy (EN)

Headlight, Right, H7/H7, with daytime running light (LED), with motor for headlamp levelling


BMW 1 (F20) (07.11-06.19)
Duty Production year KW HP Engine code From year To year
114 d 07.15-06.19 70 95 B37 D15 A
114 i 07.12-02.15 75 102 N13 B16 A 03.2015
114d 11.12-06.15 70 95 N47 D16 A 03.2015
116 d 03.15-06.19 85 116 B37 D15 A
116 i 03.15-06.19 80 109 B38 B15 A
116d 03.12-02.15 85 116 N47 D16 A 03.2015
116d 07.11-02.15 85 116 N47 D20 C 03.2015
116i 07.11-02.15 100 136 N13 B16 A 03.2015
118 d 03.15-06.19 110 150 B47 D20 A
118 d xDrive 03.15-06.19 110 150 B47 D20 A
118 d xDrive 07.13-02.15 105 143 N47 D20 C 03.2015
118 i 03.15-06.15 100 136 N13 B16 A
118 i 07.15-06.19 100 136 B38 B15 A
118d 07.11-02.15 105 143 N47 D20 C 03.2015
118d 07.11-06.19 100 136 N47 D20 C, B47 D20 A 03.2015
118i 07.11-02.15 125 170 N13 B16 A 03.2015
120 d 03.15-06.19 140 190 B47 D20 A
120 d 07.11-02.15 147 200 N47 D20 C 03.2015
120 d xDrive 03.15-06.19 140 190 B47 D20 A
120 d xDrive 11.12-02.15 135 184 N47 D20 C 03.2015
120 d xDrive 11.12-02.15 147 200 N47 D20 C 03.2015
120 i 03.15-06.16 130 177 N13 B16 A
120 i 07.16-06.19 135 184 B48 B20 A
120d 07.11-02.15 135 184 N47 D20 C 03.2015
120d 07.11-06.19 120 163 N47 D20 C, B47 D20 A 03.2015
125 d 03.15-06.19 165 224 B47 D20 B
125 i 03.12-11.17 175 238 N20 B20 A 03.2015
125 i 07.16-06.19 165 224 B48 B20 B
125d 03.12-02.15 160 218 N47 D20 D 03.2015
125d 03.12-06.19 155 211 N47 D20 D, B47 D20 B 03.2015
125i 03.12-11.17 160 218 N20 B20 A 03.2015
M 135 i 03.15-06.16 240 326 N55 B30 A
M 135 i 07.12-02.15 235 320 N55 B30 A 03.2015
M 135 i xDrive 03.15-06.16 240 326 N55 B30 A
M 135 i xDrive 11.12-02.15 235 320 N55 B30 A 03.2015
M 140 i 07.16-06.19 250 340 B58 B30 A
M 140 i xDrive 07.16-06.19 250 340 B58 B30 A
BMW 1 (F21) (12.11-12.19)
Duty Production year KW HP Engine code From year To year
114 d 06.15-05.19 70 95 B37 D15 A
114 d 07.12-05.19 70 95 N47 D16 A 03.2015
114 i 07.12-01.15 75 102 N13 B16 A 03.2015
116 d 03.15-05.19 85 116 B37 D15 A
116 d 07.12-02.15 85 116 N47 D20 C 03.2015
116 d 12.11-02.15 85 116 N47 D16 A 03.2015
116 i 03.15-06.19 80 109 B38 B15 A
116 i 12.11-02.15 100 136 N13 B16 A 03.2015
118 d 03.15-06.19 110 150 B47 D20 A
118 d 12.11-02.15 105 143 N47 D20 C 03.2015
118 d 12.11-06.19 100 136 N47 D20 C 03.2015
118 d xDrive 03.15-05.19 110 150 B47 D20 A
118 d xDrive 05.13-02.15 105 143 N47 D20 C 03.2015
118 i 03.15-06.19 100 136 B38 B15 A
118 i 03.15-06.19 100 136 N13 B16 A
118 i 07.12-06.19 125 170 N13 B16 A 03.2015
120 d 01.12-02.15 147 200 N47 D20 C 03.2015
120 d 03.15-06.19 140 190 B47 D20 A
120 d 07.12-02.15 135 184 N47 D20 C 03.2015
120 d 07.12-06.19 120 163 N47 D20 C 03.2015
120 d xDrive 01.12-02.15 147 200 N47 D20 C 03.2015
120 d xDrive 02.12-02.15 135 184 N47 D20 C 03.2015
120 d xDrive 03.15-06.19 140 190 B47 D20 A
120 i 03.15-06.19 130 177 N13 B16 A
120 i 07.16-06.19 135 184 B48 B20 A
125 d 03.15-05.19 165 224 B47 D20 B
125 d 12.11-02.15 160 218 N47 D20 D 03.2015
125 d 12.11-05.19 155 211 N47 D20 D 03.2015
125 i 03.13-06.19 175 238 N20 B20 A 03.2015
125 i 10.15-06.19 165 224 B48 B20 B
125 i 12.11-12.19 160 218 N20 B20 A 03.2015
M 135 i 03.15-06.16 240 326 N55 B30 A
M 135 i 12.11-06.16 235 320 N55 B30 A 03.2015
M 135 i xDrive 02.12-06.16 235 320 N55 B30 A 03.2015
M 135 i xDrive 03.15-06.16 240 326 N55 B30 A
M 140 i 10.15-06.19 250 340 B58 B30 A
M 140 i xDrive 09.15-06.19 250 340 B58 B30 A

Dostawa dóbr

Prekes, esančias mūsų sandėlyje, Lietuvos teritorijoje, kurjeris Jums pristatys per 1- 3 darbo dienas. Jei prekių sandėlyje nėra, užsakymo sukomplektavimas ir pristatymo terminas gali trukti nuo 2 iki 30 d.d. Jei užsakymo paruošimas truks ilgiau nei 5 d.d., el. paštu gausite pranešimą apie numatomą užsakymo paruošimo datą.