Link/Coupling Rod, stabiliser bar, Rear Axle Right, Coupling Rod, Length [mm]: 150

SKU K3481832

9,00 €
Zaproponuj swoją cenę

Informacje o produkcie

Długość: 18
Szerokość: 6
Wysokość: 3
Waga: 0.26 kg

Opis dostawcy (EN)

Link/Coupling Rod, stabiliser bar, Rear Axle Right, Coupling Rod, Length [mm]: 150


MAZDA 3 (BM) (07.13-05.19)
Duty Production year KW HP Engine code From year To year
1.50 10.13-05.19 88 120 P5Y5, P5Y4, P5Y1, P5Z3
1.50 D 02.16-05.19 77 105 S5Y7, S5Y8, S5-DPTS, S5-DPTR
1.60 09.13-05.19 77 105 Z6Y3, Z6Y1
Skyaktiv-D 150 09.13-05.19 110 150 SHY4, SHY6
Skyaktiv-G 100 09.13-05.19 74 100 P5Y5, P5Y4, P5Y1, P5Z3
Skyaktiv-G 120 09.13-05.19 88 120 PEY7, PEY5, PEXL
Skyaktiv-G 165 07.13-05.19 121 165 PEX2, PEY7, PEY5, PEXL
MAZDA 3 SALOON (BM) (09.13-12.19)
Duty Production year KW HP Engine code From year To year
1.50 10.13-05.19 88 120 P5Y5, P5Y4, P5Y1, P5Z3
1.50 D 06.16-05.19 77 105 S5Y7, S5Y8, S5-DPTS, S5-DPTR
2.00 11.14-05.19 121 165 PEX2, PEY7, PEY5
Skyaktiv-D 150 09.13-05.19 110 150 SHY4, SHY6
Skyaktiv-G 100 10.14-05.19 74 100 P5Y5, P5Y4, P5Y1, P5Z3
Skyaktiv-G 120 09.13-05.19 88 120 PEY7, PEY5, PEXL
MAZDA 6 ESTATE (GJ) (08.12- .)
Duty Production year KW HP Engine code From year To year
2.00 01.13-. 107 146 PE-VPS, PEY7, PEY5, PEXP, PEXB, PEXL
2.00 01.13-. 121 165 PE-VPS, PEY7, PEY5, PEXP, PEXB, PEXL
2.20 D 07.14-. 129 175 SH-VPTR
2.20 D 08.12-02.18 129 175 SHY4, SHY6
2.20 D 10.12-12.20 110 150 SHY4, SHY1, SHY6, SHY8
2.20 D 4WD 07.14-. 129 175 SH-VPTR
2.20 D AWD 02.15-. 129 175 SHY4
2.20 D AWD 12.12-12.20 110 150 SHY4, SHY6, SHY8
2.50 12.12-. 141 192 PYY1, PY-Y8, PY-ZA
MAZDA 6 SALOON (GJ) (12.12- .)
Duty Production year KW HP Engine code From year To year
2.00 01.13-. 107 146 PE-VPS, PEY7, PEY5, PEXP, PEXB, PEXL
2.00 01.13-. 121 165 PE-VPS, PEY7, PEY5, PEXP, PEXB, PEXL
2.00 12.12-02.18 110 150 PEY7, PEXL
2.20 D 12.12-. 129 175 SHY1
2.20 D 12.12-11.20 110 150 SHY4, SHY1, SHY6, SHY8
2.50 01.13-. 141 192 PYY1, PY-VPR, PY-Y8, PY-ZA
MAZDA CX-5 (KE) (11.11-02.17)
Duty Production year KW HP Engine code From year To year
2.00 01.12-02.17 115 156 PE-VPS, PEY7, PEY5
2.00 04.15-02.17 113 154 PEY5, PEY4
2.00 07.12-02.17 114 155 PE-VPS, PEY5, PEY4
2.00 11.11-02.17 121 165 PE-VPS, PEY7, PEY6
2.00 AWD 11.11-02.17 118 160 PE-VPS, PEY7, PEY6
2.20 D 04.12-02.17 110 150 SHY4, SHY1
2.20 D 04.12-02.17 129 175 SH-VPTS
2.20 D 04.12-02.17 129 175 SHY1
2.20 D 4WD 04.12-02.17 129 175 SH-VPTS
2.20 D AWD 04.12-02.17 110 150 SHY1
2.20 D AWD 04.12-02.17 129 175 SHY4
2.50 AWD 02.15-02.17 141 192 PYY1

Dostawa dóbr

Prekes, esančias mūsų sandėlyje, Lietuvos teritorijoje, kurjeris Jums pristatys per 1- 3 darbo dienas. Jei prekių sandėlyje nėra, užsakymo sukomplektavimas ir pristatymo terminas gali trukti nuo 2 iki 30 d.d. Jei užsakymo paruošimas truks ilgiau nei 5 d.d., el. paštu gausite pranešimą apie numatomą užsakymo paruošimo datą.