Exterior Mirror, Left, for manual mirror adjustment, black, Aspherical

SKU K95681021

154,00 €
Ponudite svojo ceno

Informacije o izdelku

Dolžina: 35
Premer: 31
Višina: 19
Utež: 2.1 kg

Opis dobavitelja (EN)

Exterior Mirror, Left, for manual mirror adjustment, black, Aspherical


VW MULTIVAN V (7HM, 7HF) (04.03-03.16)
Duty Production year KW HP Engine code From year To year
2.00 11.03-08.15 85 115 AXA 09.2009
2.00 BiTDI 09.09-08.15 132 180 CFCA
2.00 BiTDI 4motion 09.09-08.15 132 180 CFCA
2.00 TDI 05.10-08.15 100 136 CAAE, CCHB
2.00 TDI 05.11-08.15 84 114 CAAD
2.00 TDI 09.09-08.15 103 140 CCHA, CAAC
2.00 TDI 09.09-08.15 62 84 CAAA
2.00 TDI 09.09-08.15 75 102 CAAB
2.00 TDI 4motion 05.10-08.15 100 136 CAAE, CCHB
2.00 TDI 4motion 09.09-08.15 103 140 CCHA, CAAC
2.00 TSI 05.11-08.15 150 204 CJKA
2.00 TSI 07.12-08.15 110 150 CJKB
2.00 TSI 4motion 07.11-08.15 150 204 CJKA
VW TRANSPORTER V BOX (7HA, 7HH) (04.03- .)
Duty Production year KW HP Engine code From year To year
2.00 11.03-08.15 85 115 AXA 09.2009
2.00 BiFuel 06.07-08.15 85 115 AXA
2.00 BiTDI 09.09-08.15 132 180 CFCA
2.00 BiTDI 4motion 09.09-08.15 132 180 CFCA
2.00 TDI 05.10-08.15 100 136 CAAE, CCHB
2.00 TDI 05.11-08.15 84 114 CAAD
2.00 TDI 09.09-08.15 103 140 CCHA, CAAC
2.00 TDI 09.09-08.15 62 84 CAAA
2.00 TDI 09.09-08.15 75 102 CAAB
2.00 TDI 4motion 05.10-08.15 100 136 CAAE, CCHB
2.00 TDI 4motion 09.09-08.15 103 140 CCHA, CAAC
2.00 TSI 05.11-08.15 150 204 CJKA
2.00 TSI 07.12-08.15 110 150 CJKB
2.00 TSI 4motion 07.11-08.15 150 204 CJKA
VW TRANSPORTER V BUS (7HB, 7HJ) (04.03-03.16)
Duty Production year KW HP Engine code From year To year
2.00 11.03-08.15 85 115 AXA 09.2009
2.00 BiTDI 09.09-08.15 132 180 CFCA
2.00 BiTDI 4motion 09.09-08.15 132 180 CFCA
2.00 TDI 05.10-08.15 100 136 CAAE, CCHB
2.00 TDI 05.11-08.15 84 114 CAAD
2.00 TDI 09.09-08.15 103 140 CCHA, CAAC
2.00 TDI 09.09-08.15 62 84 CAAA
2.00 TDI 09.09-08.15 75 102 CAAB
2.00 TDI 4motion 05.10-08.15 100 136 CAAE, CCHB
2.00 TDI 4motion 09.09-08.15 103 140 CCHA, CAAC
2.00 TSI 05.11-08.15 150 204 CJKA
2.00 TSI 07.12-08.15 110 150 CJKB
2.00 TSI 4motion 07.11-08.15 150 204 CJKA

Dostava blaga

Prekes, esančias mūsų sandėlyje, Lietuvos teritorijoje, kurjeris Jums pristatys per 1- 3 darbo dienas. Jei prekių sandėlyje nėra, užsakymo sukomplektavimas ir pristatymo terminas gali trukti nuo 2 iki 30 d.d. Jei užsakymo paruošimas truks ilgiau nei 5 d.d., el. paštu gausite pranešimą apie numatomą užsakymo paruošimo datą.